• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
Gameranx

Gameranx

Video Game News, Lists & Guides

  • News
  • Features
  • Platforms
    • Xbox Series X
    • PS5
    • Nintendo
  • Videos
  • Upcoming Games
  • Guides

Critical Path Project Provides Unique Insights Into Game Development

July 22, 2012 by Ian Miles Cheong

A new project provides viewers with some unique insights on game development and games in general.

Critical Path is a new project that's being spearheaded by luminaries of the videogame industry, including the likes of Sid Meier, John Carmack, Will Wright, Warren Spector, Tim Schafer, Hideo Kojima, and many more.

The goal of Critical Path is to make known the videogame developers—many of whom are unknown, unlike their counterparts in film and literature—who are responsible for everything you play and enjoy.

In each minute-long episode of Critical Path, we get to listen to a unique perspective from a game designer about a game they've created. For instance, Will Wright talks about The Sims and how players immerse themselves in their avatars.

Will Wright also discusses the connections between play and storytelling and how his team at Maxis created little toy experiences which abstracted real experiences.

Needless to say, the whole project is an insightful one and well worth the watch, especially if you're interested in developing a keener understanding of games. You can subscribe to the channel.

Share this post:

FacebookTwitterLinkedInPinterest

Recent Videos

Terminator 2D NO FATE - Before You Buy

Terminator 2D NO FATE - Before You Buy

BIGGEST Flop of 2025? Call of Duty Apologizes & MORE

BIGGEST Flop of 2025? Call of Duty Apologizes & MORE

10 Brand NEW Games from Game Awards 2025

10 Brand NEW Games from Game Awards 2025

What The HELL IS GOING ON With Warner Bros. Games?

What The HELL IS GOING ON With Warner Bros. Games?

10 Atmospheric Games That Might CHANGE YOUR LIFE

10 Atmospheric Games That Might CHANGE YOUR LIFE

10 Games That Have Come A LONG WAY

10 Games That Have Come A LONG WAY

20+ YEAR Old Games That Still Look INSANELY Timeless

20+ YEAR Old Games That Still Look INSANELY Timeless

10 Things Players HATE In 2025

10 Things Players HATE In 2025

10 Game Award REVEALS That Would Blow Our Minds

10 Game Award REVEALS That Would Blow Our Minds

Category: Updates

Sidebar

Recent Posts

  • Gears of War: E-Day Still On Schedule For 2026
  • What “Realism” Feature Do Gamers Want In GTA 6?
  • What Could Truly Be “Improved” With GTA 6’s Online Mode?
  • Epic Games Store Handing Out 17 Games For Free This Month
  • Clair Obscur: Expedition 33 Likely To Get A Massive Resurgence

Copyright © 2025 · Gameranx · All Rights Reserved · Powered by Mai Theme